
31 August 2026


Eliwana was designed differently from day one.
Commissioned in 2020, its advanced low-profile plant can direct load up to 5,200 tonnes of ore per hour. Faster movement. Lower energy use. Long-term operational efficiency built into the system from the start.
Located in Nanutarra in Western Australia’s Pilbara region, on Puutu Kunti Kurrama and Pinikura Country, Eliwana is now helping lead the next shift in heavy industry.
Built for performance. Built for what comes next.
Eliwana is one of the first sites in our network being designed around renewable energy systems at scale.
Battery storage and transmission infrastructure are reshaping how heavy industry gets powered.
This isn’t theory. It’s energy infrastructure built to keep real operations moving.
We’re cutting fossil fuels out of iron ore operations. Scaling renewable energy infrastructure. Deploying the systems needed to decarbonise heavy industry.
And Eliwana is helping lead that shift.
If you want to work where new energy systems are being built at scale, this is the place.
Join us.
18455
Australia
Australia - Solomon
Operations and Maintenance
Metals
18438
Australia
Australia - Iron Bridge
Corporate and Support Functions
Metals
18399
Australia
Australia - Cloudbreak
Operations and Maintenance
Metals
18376
Australia
Australia - Solomon
Operations and Maintenance
Metals
18360
Australia
Australia - Iron Bridge
Engineering and Technical Roles
Metals
18346
Australia
Australia - Cloudbreak
Operations and Maintenance
Metals
18335
Australia
Australia - Iron Bridge
Operations and Maintenance
Metals
18317
Australia
Australia - Port Hedland
Operations and Maintenance
Metals
18309
Australia
Australia - Solomon
Engineering and Technical Roles
Metals
18261
Australia
Australia - Cloudbreak
Operations and Maintenance
Metals
18212
Australia
Australia - Iron Bridge
Engineering and Technical Roles
Metals
18159
Australia
Australia - Christmas Creek
Operations and Maintenance
Metals
18151
Australia
Australia - Solomon
Operations and Maintenance
Metals
18142
Australia
Australia - Christmas Creek
Operations and Maintenance
Metals
18135
Australia
Australia - Christmas Creek
Operations and Maintenance
Metals
18123
Australia
Australia - Iron Bridge
Engineering and Technical Roles
Metals
18118
Australia
Australia - Port Hedland
Operations and Maintenance
Metals
18112
Australia
Australia - Iron Bridge
Operations and Maintenance
Metals
17920
Australia
Australia - Iron Bridge
Engineering and Technical Roles
Metals
17908
Australia
Australia - Christmas Creek
Operations and Maintenance
Metals
17823
Australia
Australia - Solomon
Operations and Maintenance
Metals
17705
Australia
Australia - Solomon
Operations and Maintenance
Metals
17251
Australia
Australia - Iron Bridge
Operations and Maintenance
Metals
17121
Australia
Australia - Iron Bridge
Operations and Maintenance
Metals
12997
Australia
Australia - Cloudbreak
Operations and Maintenance
Metals
12098
Australia
Australia - Solomon
Operations and Maintenance
11063
Australia
Australia - Solomon
Operations and Maintenance
Metals
10730
Australia
Australia - Cloudbreak
Operations and Maintenance
Metals
Follow the projects, progress and breakthroughs driving Real Zero across our Pilbara operations.

31 August 2026

19 August 2026

28 July 2026

23 July 2026

14 July 2026

30 June 2026

29 June 2026

23 June 2026
.jpg%3Fh%3D2962%26iar%3D0%26w%3D5272&w=3840&q=75)
22 June 2026

16 June 2026